Village of Winthrop Harbor, IL

Roads Division

Maintaining 37 miles of streets and alleys across the Village

Overview

The Village of Winthrop Harbor maintains about 37 miles of streets and alleys. Our 2024 Pavement Management Study rated about 70% of those streets in fair or poor condition, with a backlog of roughly $15.9 million in needed work. Keeping up would take an estimated $2.5 to $3 million a year.

Village street projects are paid for almost entirely with Motor Fuel Tax (MFT) money from the State of Illinois, plus transfers from the Village General Fund. No part of your property tax bill is set aside for roads. That state funding covers only a small share of what our streets need, and the gap is growing.

This page explains how road funding works, why it has fallen behind, and how the Village decides which streets get done first.

Understanding How Road Improvements Are Funded

Learn how the Village funds road improvements — including Motor Fuel Tax allocations, General Fund transfers, and the gap between available funding and infrastructure needs.

View Full Explainer

Where Road Money Comes From

Motor Fuel Tax (MFT)

The State collects a tax on every gallon of fuel sold and shares part of it with cities and villages for local roads.

Village General Fund Transfers

When MFT falls short, the Village moves money from the General Fund — money that would otherwise support police, fire, parks, and other services.

Property Taxes

None are dedicated to roads. Of every property tax dollar paid, about 72 cents goes to the two school districts and about 12 cents comes to the Village — which must cover all Village services.

How the Motor Fuel Tax Works

It is a tax on gallons, not miles. The idea dates back nearly a century: the more you drive, the more fuel you buy, so the more you pay toward the roads.

Rate History

YearRate / Notes
1990State set the gas tax at 19 cents a gallon.
1990–2019Rate stayed at 19 cents for nearly 30 years while construction costs kept rising.
2019Rebuild Illinois plan doubled the tax to 38 cents a gallon and added automatic yearly increases tied to inflation.
2026Rate is 48.3 cents a gallon; a scheduled July increase to 49.6 cents was put on hold for six months.
  • It is divided by population — the local share is split among municipalities based on how many people live there, not how many miles of road they maintain.
  • It can only be spent on transportation — a 2016 amendment to the Illinois Constitution protects transportation dollars so they cannot be used for anything else.
  • It comes with State rules — projects paid with MFT money must follow IDOT's local roads requirements for engineering, bidding, and paperwork, adding oversight and cost to every project.

Why Motor Fuel Tax Funding Is Falling Behind

Construction Costs Have Outpaced the Tax

Asphalt, concrete, equipment, and labor costs have climbed faster than MFT revenue. Illinois prevailing wage requirements also apply to public road work, which raises the cost of every project.

Cars Are Using Less Fuel

Today's vehicles travel much farther on a gallon of gas than the formula ever expected. Consider three neighbors who each drive 12,000 miles a year:

VehicleEst. State Gas Tax Paid Per Year
Gas car (25 mpg)about $232
Hybrid (50 mpg)about $116
Electric vehicle$0

Estimates at the 48.3 cent rate, shown for illustration. All three use the same streets, but only one pays the full share.

EV owners pay an extra $100 a year at registration instead of fuel taxes — but that money goes to the State and none of it reaches local streets. Hybrids pay no extra fee at all.

The bottom line: Revenue per mile driven keeps shrinking while the cost per mile of repair keeps rising.

What This Means for Winthrop Harbor

The gap is large

A single mile of fully rebuilt street can cost more than $1 million, and our entire yearly Motor Fuel Tax allotment does not rebuild one mile.

We can only do a few streets a year

In 2026, the Village resurfaced about one mile of 11th Street and 13th Street for $404,062 — roughly $111,000 under the engineer's estimate. Good bids help, but one mile a year cannot keep up with 37 miles of aging streets.

Waiting makes it more expensive

Pavement wears slowly at first, then quickly. A street that could be resurfaced today at a lower cost becomes a full reconstruction later at several times the price. Delayed work never stays the same price.

Streets and water mains are connected

Much of our water system is aging cast iron pipe. On Ben Court, the same six-inch main broke twice in one winter, under a street that had just been repaved in fall 2024. This is why we coordinate road work with water main work whenever we can.

How We Decide Which Streets Come First

"Why was their street done before mine?" It's one of the most common questions we get.

Every street in the Village is scored and ranked using the 2024 Pavement Management Study and the Public Works 3-Year Strategic Plan. We look at:

  • Pavement condition score: How each street rated in the pavement study.
  • Use and traffic: How heavily the street is used.
  • What is underground: Whether water main work is planned beneath the street, so we don't repave a street we will soon need to dig up.
  • Cost effectiveness: Catching streets before a lower-cost repair turns into a full rebuild.

What the Village Is Already Doing

Planning ahead

Using the 2024 Pavement Management Study and the 3-Year Strategic Plan to put every dollar where it does the most good.

Stretching repair dollars

In 2024 the Village bought a hot box patching trailer, which lets crews use hot-mix asphalt for longer-lasting pothole repairs instead of temporary cold patch.

Bidding competitively

Getting strong bids — like the 2026 11th and 13th Street project that came in $111,000 under the engineer's estimate.

Working with partners

Working with state legislators and the Illinois Municipal League on long-term road funding solutions.

Talking with residents

Holding public conversations, including the September 17, 2026 Town Hall, about road conditions and funding options.

Resource Center

These sources informed this page and are provided for residents who want to learn more.

Road Maintenance and Funding in Illinois

How Potholes Form

Road Life Expectancy in the Midwest

Questions or Concerns?

To report a pothole or road concern, or to ask about upcoming street projects, contact the Public Works Department or visit Village Hall.

830 Sheridan Road, Winthrop Harbor, IL
Submit a Service Request Online

Village Documents